Civil, road, utility and MEP works under one contractor
Six disciplines, supported by in-house asphalt, aggregate and concrete production and an owned plant fleet.
Building Construction
Residential, commercial, institutional and industrial structures.
- Residential construction
- Commercial construction
- Offices and institutional buildings
- Warehouses and industrial facilities
- General structural and civil works
Roads and Infrastructure
Pavements, resurfacing, structures and road furniture.
- Road construction and rehabilitation
- Sub-base and base course works
- Asphalt surfacing and resurfacing
- Flexible and rigid pavements
- Highways and arterial roads
- +4 more
Water and Utility Infrastructure
Sewerage, drainage, RO and UF plants and long-term operation.
- Sewerage networks
- Underground sewer lines
- Manholes
- Stormwater drainage
- Surface water channels
- +5 more
Mechanical, Electrical and Plumbing
Power distribution, HVAC, plumbing and firefighting systems.
- Electrical wiring and distribution
- Panel installation
- Lighting systems
- HVAC
- Plumbing
- +3 more
In-House Material Production
Asphalt, aggregate and concrete produced under own control.
- Asphalt mixing and hot mix supply
- Aggregate crushing and screening
- Ready mix concrete production
- Concrete batching
Project Management and Delivery
A defined sequence from planning through to handover.
- Planning
- Mobilization
- Execution
- Quality control
- HSE monitoring
- +3 more
From planning to handover
The same sequence governs a small maintenance package and a multi-hundred-million-rupee road rehabilitation.
- 01
Planning
Scope review, method statements, programme and resource allocation before mobilization.
- 02
Mobilization
Site establishment, plant deployment, traffic management and site team induction.
- 03
Execution
Works carried out to approved methods with supervision by discipline engineers.
- 04
Quality control
Material approvals, in-process checks and testing against contract specification.
- 05
HSE monitoring
Risk assessment, control measures, inspection and corrective action on site.
- 06
Progress management
Measurement, reporting and coordination with the employer and consultant.
- 07
Testing and commissioning
System and surface testing, snagging and verification before acceptance.
- 08
Handover
Documentation, as-built records and formal transfer to the employer.
Discuss your next infrastructure package
Share the scope, location and programme. We will respond with the relevant experience, resources and a route to a proposal.