People and plant behind the delivery record
Contracts are resourced with in-house technical staff and an owned equipment fleet, so programme and quality do not depend on third-party availability.
Disciplines deployed on our contracts
The company profile records 25 technical personnel across the disciplines below. Individual names, qualifications and experience will be published from the approved profile document.
Project leadership
Contract, project and construction management.
Civil and structural engineering
Design coordination, structures and civil execution.
Planning
Programme development, sequencing and progress control.
Electrical and mechanical engineering
MEP installation, plant and commissioning support.
HSE and environmental management
Risk control, inspection and environmental compliance.
Quantity surveying and cost management
Measurement, valuation, procurement and cost reporting.
Site supervision
Day to day supervision of trades and subcontractors.
Surveying
Setting out, level control and as-built survey.
Owned equipment fleet
The company profile lists 45 categories of tools and machinery. Models, quantities and condition will be published from the approved profile document.
Road construction equipment
- Asphalt mixing plant
- Asphalt pavers
- Static rollers
- Vibratory rollers
- Pneumatic tyre rollers
- Milling machine / road cutter
- Bitumen sprayer
- Compactors
Earthmoving equipment
- Excavators
- Wheel loaders
- Motor graders
Concrete equipment
- Concrete batching plant
- Concrete transit mixers
- Concrete pump
Transport and lifting
- Dump trucks
- Mobile cranes
- Water tankers
Survey equipment
- Survey instruments and levelling equipment
Safety and site support equipment
- Air compressors
- Generators
- Safety equipment
- Traffic control items
Material supply under our own control
Asphalt mixing, aggregate crushing and concrete batching capacity allows the company to control mix design, supply continuity and delivery timing rather than depending on external suppliers during critical paving windows.
On live carriageways this matters: resurfacing is frequently executed at night within short possession windows, and a break in hot mix supply is a break in the programme.